Bhide Bridge to be completely closed to vehicles until December 31 for pedestrian bridge
Pune Metro announced the closure of Bhide Bridge to vehicles to ensure public safety, and the road through the Mutha riverbed will stay open.
IllustrationFrom 6 am on November 19 until December 31, 2026, Bhide Bridge over the Mutha River will be completely closed to vehicles for the construction of a pedestrian bridge above the existing bridge.
The pedestrian bridge will connect Deccan Gymkhana Metro Station with the Peth areas. It is expected to make metro access easier for residents of Narayan Peth, Shaniwar Peth and the areas around Laxmi Road, and for students travelling to educational institutions in the area.
The road running through the Mutha riverbed will remain open during the closure. Commuters have been advised to use Lakdi Bridge, Balgandharva Bridge or Z Bridge instead.
Pune Metro announced the restriction to ensure public safety during the work, and has appealed to citizens to plan their journeys accordingly. Metro authorities said the pedestrian bridge would be completed as soon as possible and expressed regret over the inconvenience.

